Marenter has completed different kinds of marine jobs such as the laying of submarine water pipeline to breakwaters, marinas, etc. It has always used the best technology and materials.

 

 

 

 

 

 

 

Laying  of the  submarine  pipeline  between  Punta  Sam and Isla Mujeres.
  • 5,750 m long.
  • Maximum depth 12 m.
  • Strong currents.
  • Ballasted with geobags and concrete anchors.
  • Trenching and burial of the pipeline.
Map of the water pipeline from Cancun to Isla Mujeres

Algunas obras que hemos realizado:

  • Eliminación de lodos y pastos marinos.
  • Creación de pasos sobre dunas.
  • Restitución de dunas costeras.
  • Paisaje costero.
  • Delfinarios.
  • Colocación y lastrado de tuberías.
  • Rompeolas para marinas.

 
Pipeline coupling and trenching.